User Name:
Password:
  
Groundwater Monitoring and Evaluation
  • Hydrologic investigation and dewatering system design and operation for the Big Rock Mesa Landslide, Malibu, California for the County of Los Angeles and the City of Malibu, California
  • Hydrologic investigation and dewatering system design and operation for the Oceanside Manor Landslide, Oceanside, California for the Oceanside Manor Homeowners Association.
  • Winterization design, geotechnical monitoring and hydrogeologic investigation for Montellano Landslide, Hacienda Heights, California for the County of Los Angeles.
  • Groundwater monitoring well installation, sampling and monitoring for the Mid-­City segment of the Los Angeles Metro Rail Project in Los Angeles, California for the Los Angeles County Transportation Authority.
  • Groundwater monitoring well installation / monitoring and de-watering well installation / operation for the Calle del Barco Landslide, Malibu, California for the City of Malibu.
  • Groundwater monitoring well installation / monitoring and de- watering well operation for the Rambla Pacifico Landslide, Malibu, for Los Angeles County.
  • Design, installation and monitoring of geotechnical instrumentation and groundwater monitoring wells, Abalone Cove, Rancho Palos Verdes, California for the City of Rancho Palos Verdes.
  • Groundwater well installation and monitoring for the Bell Gardens Redevelopment Project, Bell Gardens, California.
  • Design, installation and operation of groundwater recovery wells for the Wright Petroleum Site, Laguna Hills, California for Fireman's Fund Insurance Company. This project also included the design, installation and operation of a groundwater treatment system to remove petroleum hydrocarbons from the groundwater prior to its re-injection into the ground.
  • Pump tests and construction dewatering evaluation for the planned Wilshire/Western Station and interconnecting tunnel of the Metro Rail Red Line Project, Los Angeles, California for the Los Angeles County Transportation Authority.
  • Installation of groundwater wells for monitoring the extent and migration of PCB plume at former die-casting facility, Los Angeles, California.
  • Installation and operation of groundwater production wells for stabilization of Malibu Road Landslide, Malibu, California.